What are the base requirements for the robot installation?
We offer two installation options:
Palletized Cell: This option doesn’t require mounting to the concrete, making the setup portable.
Concrete-Mounted Installation: For a permanent installation, the robot is bolted to a concrete floor. This setup requires four large-diameter concrete anchors (at least 3/4 inch in diameter) and four concrete bolts for securing the printer surface. The concrete should be a minimum of 6 inches thick with a strength of at least 3,000 psi.