Skip to content
English - United States
  • There are no suggestions because the search field is empty.

Are there any general requirements or requests for the day of installation?

Yes, please ensure the following:

Compressed Air: 10 SCFM at 90 PSI.
Internet: Available for remote support.
Plant Floor Preparation: Clear the area of any equipment not required for the system’s operation or that may interfere.
Floor Leveling and Anchoring: Level and anchor the cell equipment, reinforcing the floor if needed.
Consumable Materials: Procure all consumables needed for system operation.
Electrical Power and Compressed Air: Ensure power and compressed air drops are accessible at the robot cell location.
Disposal and Shipping: Arrange disposal or shipping for any materials or containers, as needed.
Shipping and Fees: Cover all shipping, freight, duties, tariffs, taxes, and other delivery-related expenses.